Windows, doors and hardware for a City of Santa Barbara community building renovation.
Technical scope
4 systemsSpecification
Fiberglass Double-Hung & Awning Windows
Marvin Essential
- Rated LC-PG50, DP +50/−50
- Water resistance 7.52 psf
- U-factor 0.29
- Solar heat gain coefficient 0.22
- Visible transmittance 0.51
- Condensation resistance 57
- ENERGY STAR certified
- Tempered Low E3 insulating glass with argon
- Stainless steel perimeter bar
- Stone White exterior and interior
- Nailing fin, 2" jambs
- Exterior aluminum screen, BrightView mesh
Marvin Essential Windows
10 composite units
- Dual-pane Low-E: tempered Low E3 with argon and stainless spacer
- Double-hung W1 (38" × 50") and W2 (47-1/2" × 50", qty 2)
- Awning-over-fixed W3/W4 (36" × 36", qty 7, 3 obscured)
Wood & Solid-Core Doors
1-3/4", prehung in primed 4-9/16" jambs
- Fir raised-panel doors: D3 6'-0" × 6'-8" pair with insulated glass, D4–D6
- Flush HDF solid-core doors: D7 with 30" tempered lite, D10–D12
- Dutch door D8 and barn/track door D13
- D9 double door with tempered lites (added by change order)
Door Hardware
626 brushed nickel
- 1279 commercial hinges
- Dormakaba 8600 closers (LCN 1460 at D11 and D12)
- Rockwood 70B kick plates
- A7700 rim and A7760V vertical-rod panic devices, SL04 lock
- Aluminum ADA sills and bronze weatherstrip
Installed configuration
- Spec sections
- 08 14 16 · 08 54 00 · 08 54 13 · 08 71 00 · 08 80 00
- Schedule
- March–June 2026
- Contract
- California prevailing wage public works
Project delivery
- Approved submittal package (v12)
- Certified payroll through LCPtracker and the DIR portal
- Conditional and unconditional waivers every billing cycle
- Apprenticeship training fund contributions
- Managed in-house, submitted complete every month