All scheduled windows and doors for Buildings C and D of a residential treatment campus renovation.
Technical scope
5 systemsTimeless Vinyl Windows
Premium Windows and Doors
- Nail-on picture windows (Types B, D, E, G)
- Single-hung (Types A, F)
- Horizontal slider (Type C)
- XOX picture window (Type H)
- Glass per schedule: 1/4" clear or tempered
- Building D converted to block-frame installation
Waterproofing
- Henry FortiFlash 25 mil flashing
- Jamsill Guard sill pans
Doors & Frames
- Hollow metal and solid-core wood doors
- Timely frames
- National Guard L-FRA100 lite kits and L-700 louvers
Door Hardware
- Schlage L9000-series mortise locks
- McKinney TA2714 hinges
- LCN 4040XP closers
- Von Duprin 88EO exit devices
- Rockwood 403 stops and Pemko S44BL gasketing
Bath Mirrors
24" × 36"
Installed configuration
- Buildings
- C and D
- Submittal
- #12, approved as noted (Nov 2025)
Project delivery
- Windows, doors, frames and hardware with flashing and sill pans
- Building C installed by January 2026
- Closeout waivers issued July 2026